DRAWING REF: CB-MD-0008-REV-D
SCALE: AS INDICATED · BS EN CONFORMANT
CB-MD-0008
Pre-Insulated Utility Units & MEP Service Risers
Cabivella VerticalRiser Multi-Service Offsite Steel MEP Riser Module
Floor-to-floor pre-fabricated vertical MEP service riser cassette. Fully assembled with structural steel support frame, soil and waste stacks, potable boosted water pipes, heating flow/return pipes, electrical busbars, and cast-in firestop penetration collars.
SEND PROJECT DETAILS →TABLE A: DIMENSIONAL & GEOMETRIC SPECIFICATION
| Standard | BS 8558 / BS EN 12056 / BS EN 12845 (Fire sprinklers) |
|---|---|
| Thermal Insulation | Foil-faced phenolic foam insulation pre-lagged on all pipework |
TABLE B: PHYSICAL & PERFORMANCE CHARACTERISTICS
| Trace Heating | Self-regulating trace heating pre-wired on cold water mains |
|---|---|
| Flange Connections | Roll-grooved Victaulic or press-fit Mapress connections for rapid jointing |
TABLE C: STANDARDS, COMPLIANCE & ACCREDITATIONS
| Testing Protocol | Hydrostatically pressure tested to 1.5x working pressure in factory |
|---|---|
| Floor Slab Penetration | Drops into pre-formed slab opening with acoustic decoupling brackets |
| Safety Handover | Supplied with temporary floor mesh covers to prevent site fall hazards |
| High-Rise Optimized | Engineered for rapid storey-by-storey erection in high-rise towers |
Direct Freight & Procurement Security
Manufactured in Türkiye under European BS EN, BBA, and BOPAS certified quality regimes. Full traceability with third-party lab testing and mill certificates supplied with every bill of lading.
Direct Factory Procurement
Request Technical Specification & Pricing
Submit your architectural project bill of quantities (BOQ), tender drawings, or required schedule. Our technical team returns guaranteed DDP / FOB factory pricing and testing certifications within 24 hours.