EN 10204 3.1
Inspection Certificate Included
CE & UKCA
Factory Quality Gate Approved
Catalogue / CB-UP-0027 · Cabivella ThermalMaster High-Efficiency Passive Fenestration
Cabivella CurtainWall uPVC Façade System
Structural mullion-transom façade system combining internal structural steel core pillars with thermally insulated external uPVC covers for multi-storey glazed lobbies.
Procurement Status
Direct Factory Dispatch · Project Quantities
| Table A: Structural & Dimensional Geometry | |
|---|---|
| Structural Mullion | Internal structural box tube |
| Table B: Material & Performance Specifications | |
|---|---|
| External Cover | UV-stabilized uPVC pressure cap |
| Application | Multi-storey glazed atriums |
| Table C: European Compliance & Quality Gates | |
|---|---|
| Harmonized Standard | BS EN / ISO Harmonized Structural Code |
| Quality Assurance | Factory Production Control (FPC) ISO 9001:2015 |
| Mill / Test Traceability | EN 10204 Type 3.1 Inspection Certificate with Cast/Heat ID |
| Regulatory Marking | CE Mark (EU Construction Products) / UKCA Compliant |
| Supply Origin | Marmara Industrial Basin, Türkiye (Direct Port Dispatch) |
Procurement Note for Project Estimators
Profiles, assemblies and materials are supplied to exact project schedules. Custom fabrication, cutting, punching, thermal breaking and powder coating to bespoke RAL specifications are supported at our primary production facilities.
Direct Trade Specification & Quotation
Put your project specification
in front of our engineering team.
Share CAD schedules, drawings, destination port/site, and required material volumes. We evaluate compliance against BS EN standards and deliver FOB / DDP commercial terms.